CREATIVE CABLE AND MESH SOLUTIONS
Near the university hospital in Aachen the new Campus Melaten for education and research is built - the first building is realized with a 29 meter, futuristic cubus. To secure the 7 floors, X-TEND stainless steel cable mesh was integrated into the staircases in an optimal way.
Staircase safety
X-TEND CXE ◊ 60 mm, ø 2 mm, I-SYS vertical wire ropes